Friday 30 May 2014

Good Photos with 3D Drawing as of May 31 2014



Trunk Tunnel almost done 43 out of 44 


Aluminum Composite Tubular Frame Installed X14-X11 Trunk Tunnel


Street Lights at Ramp 1


External Street Lights





3D Drawings May 31 2014









Wednesday 28 May 2014

Site Photos May 28 2014



Installation of Basalt Tiles between Main Building and Buttress Area


Almost done Escalator Phase 1 at Basement


 40 out of 44 Trunk Tunnel Bay Area


 Excavation of Parking Shed Foundation 



Installation of Precast Slab at Roof Area by ARA



Installation Viscon white tiles at ground floor





CONSTRUCTION MANAGER

Engr.Mario Liboon
Construction Manager
Al Jouf Railway Station Project


QUALITY ASSURANCE / QUALITY CONTROL DEPARTMENT

Engr. Federico Sicat
QA/QC Engineer
Al Jouf Railway Station Project





Engr. Mohammad Riyad
Laboratory Incharge
Al Jouf Railway Station Project


Sunday 25 May 2014

3D Drawings May 24 2014

PASSENGER STATION
Al Jouf Railway Station


MOSQUE
Al Jouf Railway Station


ELECTRICAL AND MECHANICAL DEPARTMENT






Engr.Ryad Hazza
Electrical Engineer
Al Jouf Railway Station Project



Engr. Luisito De Luna
Electrical Engineer
Al Jouf Railway Station Project 




Engr. Shadi Hamo
Mechanical Engineer
Al Jouf Railway Station Project 


Engr. Mohammad Jameel
Mechanical Engineer
Al Jouf Railway Station Project



CIVIL/ARCHITECTURAL/STRUCTURAL DEPARTMENT

Engr.Santiago Sudario  III
Senior Civil Engineer
Al Jouf Railway Station Project



Arch.Maged Hozaien
Architectural Engineer
Al Jouf Railway Station Project