Installation of Basalt Tiles between Main Building and Buttress Area
Almost done Escalator Phase 1 at Basement
40 out of 44 Trunk Tunnel Bay Area
Excavation of Parking Shed Foundation
Installation of Precast Slab at Roof Area by ARA
Installation Viscon white tiles at ground floor
40 out of 44 Trunk Tunnel Bay Area
Installation of Precast Slab at Roof Area by ARA
Installation Viscon white tiles at ground floor